65% PLAN for the Willow Creek Daylighting Project. The Plan features native vegetation to enhance habitat, with design details for outdoor classrooms, amphitheaters, and other features to be developed collaboratively with stakeholders.
Download the Phase Map showing the five project phases from the Golden Gate National Recreation Area to Richardson Bay.
Report summarizes site conditions, soils, hydrology, ecology, and existing infrastructure for Willow Creek, and presents proposed stream restoration design, engineering analyses, and construction and maintenance considerations.
Report includes field survey methods and existing site conditions, including soils, landcover, vegetation, wildlife resources, and sensitive habitats, and evaluates special-status species and outlines project benefits and protection measures for construction impacts.